Thursday, January 19, 2012

Miller School of Learning Renovation 2011-2012

When starting the renovation we noticed we had a huge past of termite damage (they've been gone for years but the damage was never fixed) so we had a contractor come out and fix the damage and that included taking off some of the siding

Russ had this space all gutted-he even took a wall down between what used to be two rooms

Everything down to the bare minimum

Who would have thought this would have become Miller School of Learning?

Russ hung all the insulation and drywall and here is the framing for my storage closet

Hanging insulation

All the drywall is up and mud and taped

We chose a Winnie the Pooh yellow color for the room

My closet is finished

Beautiful white trim that Russ put on everything

The built in book case unit that Russ made

My closet is already packed with preschool matterials

Our preschool table used for art and sensory right now and the Housekeeping area

The Housekeeping Area

Where the girls play with blocks on the left and all the manipulatives on the right

No comments:

Post a Comment